Tanglewood Shores Association Construction Permit Application
No delivery of bulk materials, mobile homes, or heavy equipment such as dump trucks,
cranes, backhoes, etc.; nor any lot clearing or groundwork will be allowed after 6:00 pm on
Fridays until 8:00 am on Mondays without written permission from the Association. All lotclearing
debris must be hauled offsite. On-site burning of construction debris is strictly
Driveway entrance culvert pipes shall be installed to maintain a positive water flow. Riprap
shall be placed at both ends of the pipe a minimum of three (3) feet to provide sediment
control. Entrance pipes and associated ditches shall not create drainage issues for
adjacent property owners.
Property owners or contractors are required to submit plans to the ACC, obtain permits,
and pay fees to the appropriate county before starting any construction, change, or
modification. Approval of plans by the ACC does not guarantee approval by Mecklenburg or
Brunswick County Building Departments. Failing to meet the requirements specified herein
will result in a Stop Work Order issued by the ACC, with Tanglewood Shores’ Board
approval, and in most cases an order to tear down the illegal structure(s) with no guarantee
of being able to resume construction.
Road fee : $1250
If Paid After Work Begins: $1400
| File | Uploaded | |
|---|---|---|